Shawan Hydropower Station is located in the core hinterland of Greater Shangri-La. It is located on the upper reaches of the Yalong River with the most concentrated drop and the best indicators. The installed capacity of the project is 288,000 kilowatts, the annual utilization hours are 5,120 hours, and the annual design power generation capacity is 1.474 billion kWh.