

Power station in Panxi National Development Zone
Sichuan Dechang Xiaogaoqiao Hydropower Station is located in the "National-level Panxi Strategic Resources Innovation and Development Experimental Zone", with a total installed capacity of 18,000 kilowatts. It was put into operation in 1992 and benefited from the annual storage of the upstream Daqiao Reservoir. The average annual power generation hours exceeded 7,000 hours. The average annual power generation is 126 million kWh. Since the upstream reservoir of the Dechang Xiaogaoqiao Hydropower Station in Sichuan has annual regulation capacity, its profitability is equivalent to the national average installed capacity of hydropower 40,000-50,000 kilowatts.
Hong Kong: 11th Floor, Metropolis Building, 10 Metropolis Drive, Kowloon, Hong Kong
Group Headquarters: 17th Floor, Dunhuang Building, Zizhu 6th Road, Shennan Avenue, Futian District, Shenzhen
Chengdu Supervision Center: 8th Floor, Fugang Commercial Center, 326 Shuangnan Road, Chengdu, China
Group Nanning Branch: Room 4612, building west of Qingxiu District Wanda Plaza, Qingxiu district, Nanning city
Copyright 2020 Yetop Energy Group 蜀ICP备09004852号 Sichuan Public Network Security51010702001488